Here they also sold a novel design, Olki 3 ate most of the construction teething issues (though flamanville hit its fair share as well), Taishan seems to have g
by masklinn 5y ago
Here they also sold a novel design, Olki 3 ate most of the construction teething issues (though flamanville hit its fair share as well), Taishan seems to have gone better as they entered service in 2018 and 2019.
Construction and operation teething issues are nothing surprising, but Areva was definitely… way over-optimistic about the EPR.
I still can’t believe they advertised a 4 years plan when the first N4 (previous generation) took 12 years to build, and needed an additional 4 before it started operation.
Hell, going down the list of reactors on the wiki, even the 900MWe class never went from first stone to operation in 4 years, the shortest looks to have been Blayais 1 which took a hair short of 5 (January 1st, 1977 to December 1st, 1981), and taking somewhere between 5 and 6 was much more typical for the 900MWe class. The P4s were a bit worse (7-9) and the N4s were way worse (the shortest time between build start and start of operation was Civaux 2 at 11 years, the Chooz reactors took 16).