Replace the second avenue subway with any other major passenger rail line built in the US in the last ten years, look at the costs per mile of track laid, and s
by asdff 5y ago
Replace the second avenue subway with any other major passenger rail line built in the US in the last ten years, look at the costs per mile of track laid, and see that this is not some unique geological issue with manhattan but a national issue with the ability to cheaply and quickly construct capital improvements.
- m0llusk 5y agoThat makes no sense. Most subways are built with cut and cover. The Second Avenue was only made possible with the very latest in tunneling technology. And that meant a path being dug carefully around multiple existing subways, lots of other infrastructure, and the relatively delicate foundations of old buildings. Furthermore, as I pointed out, the extreme impracticality of the Second Avenue subway was documented starting from the first proposal around a hundred years ago which was rejected as being too expensive to make sense. And that was the first of many such studies. Yes, we need to figure out infrastructure and have some problems, but a project that was known to be essentially impossible for a hundred years is being used as a way to bump the averages here. It is not possible to effectively or reasonably generalize based on the most extreme exception available.
- Shacklz 5y agoAgain: Reading comprehension. Reread OPs comment again, he wasn't referring to some averages over all projects, he was telling you to take any project and you will see similar issues.