10 ms·
> With a geometric mean, all you need is one sample with lead exposure close to 0 to get a mean that's close to 0, even if all the other samples tested positive
by BeetleB 5y ago
> With a geometric mean, all you need is one sample with lead exposure close to 0 to get a mean that's close to 0, even if all the other samples tested positive for extreme levels of lead exposure.
Not going to comment on whether arithmetic or geometric mean is more appropriate, but your comment is incorrect.
Yes, a number close to 0 brings everything down. But then you take the nth-root, which brings it back up again. Some examples - assume one of the numbers is 0.01 (close to 0).
2 samples means square root - that becomes 0.1
3 samples means cube root - that becomes 0.215
10 samples means 10th root - that becomes 0.63
20 samples means 20th root - that becomes 0.794
The more samples, the less impact an outlier like a number close to 0 will have.
Put another way, the arithmetic mean has the same problem. Extreme outliers can greatly influence the sum. But if you have enough samples, each extreme outlier is tempered a bit by dividing by n.
- nfw2 5y agoIf you want to be precise, what I meant was that there is no level of exposure in the first n samples so great that the geoemetric mean of n+1 samples is certain to be over any arbitrary value X This is not true of arithmetic mean. If you have 9 samples with value 10, then the arithmetic mean of 9 samples plus one more is certainly at least 9.
- BeetleB 5y agoIgnoring the context, and speaking only to the math, the two examples you give are not analogous. In a geometric mean, picking a number below 1 is the equivalent of picking a negative number in the arithmetic mean. The multiplicative identity is 1, and the additive identity is 0. Going below 1 for the geometric mean is like going below 0 in the arithmetic mean. So mathematically, you do not have a guarantee with the arithmetic mean either. Of course, in your case, the numbers aren't allowed to be negative. Either approach you take, there is some "contextual" bias going on.
- nfw2 5y agoWhy is it helpful to ignore the context? My examples clearly state I am making statements in the context of taking exposure samples
- montalbano 5y agoI think you're making potentially invalid assumptions about the about the relative scales of the numbers involved. The issue is that if the small outlier leads to the product being less than 1, the degree of the root doesn't matter because the largest value possible of the n-th root approaches 1, which may be below whatever meaningful thresholds are relevant here.
- BeetleB 5y ago> The issue is that if the small outlier leads to the product being less than 1, the degree of the root doesn't matter because the largest value possible of the n-th root approaches 1, which may be below whatever meaningful thresholds are relevant here. That is true, but I don't see the relevance given the context. If the geometric mean approaches 1 (i.e. after the n-th root), then you have too much lead. If all your samples have lead levels well below tolerance, then the n-th root of the product will not approach 1, but will be significantly smaller. Example: If all 10 samples are 0.01, the geometric mean is 0.01.