3 ms·
As a contractor, I once made a tool that made things easier for me. The "breakeven" time (time saved exceeded time spent writing it) was a day or two. I made
by aidenn0 5y ago
As a contractor, I once made a tool that made things easier for me. The "breakeven" time (time saved exceeded time spent writing it) was a day or two. I made the mistake of sharing this tool and was berated by the client. Every single time after that they made sure to remind me not to work on things "outside the scope" of the contract as apparently writing tools to increase the output they get per billed hour is out-of-scope.