3 ms·
>Fifty-two piles will be drilled along the north and west sides of the tower all the way down to bedrock. If the bedrock is now supporting a significant share
by Mulpze15 5y ago
>Fifty-two piles will be drilled along the north and west sides of the tower all the way down to bedrock.
If the bedrock is now supporting a significant share of the building, does it make it more or less able to cope with earthquakes?