Thank you for your comments, I appreciate it. I'm still not sold, however. I would like to understand the underlying principles, "how this works". I don't need
by ahachete 5y ago
Thank you for your comments, I appreciate it. I'm still not sold, however. I would like to understand the underlying principles, "how this works". I don't need implementation details (happy if they are shared, though) but more on the main principles of operation. Please see my further comments below:
> Git is very bad at analyzing SQL diffs.
Agreed, nothing against. So PS has built-in a nice SQL diff. Neat! But what this really brings? I mean, it's not that there aren't SQL diff tools, tools to manage DDL migrations. Besides this, why not layer it on top of Git? Many orgs and integration tools already have similar workflows (e.g. approval workflows, issue management tools, CI, etc) and if instead of coming up with a new system it would be a layer on top of the existing ones, it would probably have less friction to use. Just my perspective on this, of course.
> Run concurrently to your production traffic
Can you elaborate? How? Do they run on another servers? Or are they waiting on a queue change waiting to be applied? If they run on different servers, what they run there, since AFAIK the migration is only DDL, there's no data?
> Will automatically throttle when your production traffic gets too high, and in particular taking care not to affect replication lag
Same as above: who will throttle, the migration? But what is the migration? Let's use my example: a column type change requires a table rewrite. So the table rewrite will throttle, i.e. slow down? But where is this table rewrite running, on the main server (apparently not) or on a shadow server (apparently either since migrations have no data)? Actually you mention "when your production traffic gets too high". What is "high", can you quantify? We run customers that do dozens to thousands of transactions per second. Is this high enough? Will their migrations ever run, or will wait for very long periods of time, maybe forever?
> Will run completely lockless throughout the migration
How is this possible? Where the migration is running, then? A shadow table, shadow server... none?
> At cut-over point
What's cut-over? Are groups of servers switched? This is what it sounds to me, and that would explain how it could be lock-less and not affecting production traffic. However, it does not explain how data is synchronized from the production database to the migration branch, nor how it keeps being updated with the real production traffic. This is essentially the crux of me failing to understand how this system works.
In general, I apologize if these are too many questions. But in essence, I feel this all sounds really well, but unless I have a deeper understanding of how the principles work, and they are sound to me, I won't be able to recommend this for production usage, as I know from experience the many caveats migrations have. If they are all solved, hats off, but I would appreciate if from a technical perspective this would be more clearly explained.
Thank you!
- ahachete 5y agoI think this comment answers most of my questions: https://news.ycombinator.com/item?id=29248306 https://news.ycombinator.com/item?id=29248306 Can you confirm (PS) this is how it works? From what I understand here, there are "shadow servers", replicating from the production traffic. If so, this is cool. I still see some caveats: * One already mentioned, the scope of migrations is limited to those where both old and new DDL are compatible with the currently running application. If this is the case, I believe it should be clearly advertised as such. * Being the migration asynchronous, I lose control of when to deploy changes to the application. Even a hook would go a long way, to trigger this. * Not knowing exactly then the cut-over process is going to happen is also potentially a problem. I understand the cut-over may involve performance degradation (e.g. higher latency) or even connection loss (may you also confirm PS how it is performed?) during some period of time, possibly small. But still, I may need to plan a small maintenance window. But if this is async, I cannot plan the window appropriately. Neither of this takes away any merits from the solution.
- shlomi-noach 5y agoThank you! Please first see my comments to parent, as they describe how online schema change work within the same server; with PlanetScale branching, we do give you a development branch with which you can play as much as you want, without affecting production. Online schema change kicks in when you deploy your changes to production. > the scope of migrations is limited to those where both old and new DDL are compatible with the currently running application. You are absolutely correct, and that is the paradigm. Say, for example, you want to add a column, so you first run the migration that adds the column, and only afterwards can you deploy an application change that actually utilizes that column. Likewise if you want to DROP a column, you first deploy an app change that ceases to reference the column, and only then can you actually drop it. This paradigm worked very well for the companies I worked with, and makes for both loose and tight coupling between code and database. It's loose when you have your test databases where you can deploy schema changes at will. It's loose in the sense you can take small steps at a time, each isolated from the other (e.g. ADD COLUMN does not require you to make any app changes _yet). Then, it's tight where you couple your code changes with the schema in your git repo. It's tight in that the app never gets too far from the database (normally one change away at any given time, per development branch). > Being the migration asynchronous, I lose control of when to deploy changes to the application Great point and absolutely on our radar. > Not knowing exactly then the cut-over process is going to happen is also potentially a problem. Again great point and on our radar. To be honest I previously moved away from caring about the exact cut-over time. We designed gh-ost to do just that: stall cut-over until the engineer/developer is happy to sit at their desk. OVer time, we found it was unnecessary. But absolutely there's use cases for both approaches.