Not only are there 10x engineers, I personally know an objectively measured 500x engineer. He is humble because he knows someone who produces 10x what he does (
by ncmncm 5y ago
Not only are there 10x engineers, I personally know an objectively measured 500x engineer. He is humble because he knows someone who produces 10x what he does (albeit spending twice as much time at it).
The measurement happened as a result of a joint venture between Siemens AG and Ericsson called Ellemtel. Each company sent 250 [edit: not 500] engineers. It was a six month project, the classic death march: if it did not deliver on time, the parent companies would not be paid.
At the end of the project, half the code delivered was his. Had he not been on the project, it would not have been completed on time, so no product would have been delivered. [Edit: Thus, it is not really the line count that makes him a 500x engineer.]
- mrisoli 5y agoAssuming you can objectively measure someone like this, either by LoC or delivery times, this is the wrong way to approach any project. Having a 10x engineer(or even worse, a 500x engineer in this alleged case) is a huge risk for the company, should the engineer want to leave or if they are incapacitated in a tragic event, the company is severely handicapped, ideally a so-called 500x engineer should spend less time writing the actual code and instead mentoring/managing others to scale up their knowledge, should the company do this right, they might not deliver on time, but they'll have a much wider array of experts when something breaks or for the next projects, reduces overall company risk and it's more profitable in the long run.
- ncmncm 5y agoYet, they in fact delivered and got paid, and (pay attention!) would not have delivered and not got paid, otherwise. Risk is speculation about the future. Here we have full benefit of hindsight, and the choice taken was manifestly correct, despite all counterfactual speculation.
- PragmaticPulp 5y ago> I personally know an objectively measured 500x engineer. He is humble because he knows someone who produces 10x what he does (albeit spending twice as much time at it). So your 500X engineer knows a 5000X engineer and he wrote as much code as 999 other engineers combined? (That would make him a 999X engineer, FWIW) A 500X engineer (per your measurements) would have to write 500 lines of code every day without fail, while all 500 other engineers in the entire company could only average 1 line of code per day. And the 5000X engineer they know would have to write 5000 lines of code per day while everyone else was only limited to 1 line of code per day. Not just one day, but every single day for six straight months. And all of their managers would have to somehow not notice this disastrous situation for the duration of the project. Come on. I think you've been fed some exaggerations.
- Nasrudith 5y agoThe multipliers are all relative and seldom in simple metrics such as lines of code. If you wanted to inflate the numbers in a technically truthful way stick in a complete novice capable of preparing (so they are not negative) but not prepared for a complex field so their multiplier will be low. Use them as your 1X and even burnt out and demotivated employees who don't stand out could wind up performing 50x relative to them.
- wittycardio 5y agoYou don't measure code by the number of lines written, you measure it by amount of productive value. Early engineers at Google were easily 500x ( keep adding more zeros if you want ) more valuable to google than a random swe today
- ncmncm 5y agoIf you thought this was about lines of code, you were not paying attention.
- Jensson 5y agoFor any positive real number X and employed engineer A with positive productivity, I can find an employed engineer B where productivity of A is more than X times the productivity of B. Proof: Pick B to be an engineer with productivity 0. 0 * X = 0 for all X. Productivity of A is defined to be positive, so is greater than 0. Hence productivity of A is greater than X times the productivity of B.
- JBiserkov 5y agoAnd then there's people with negative productivity.
- ncmncm 5y agoThe person who told me about this was the person who counted up the code at the end of the project. And, yes, it was 250 from each, not 500 from each parent company. (Memory is funny that way.) I do not doubt that the numbers were rounded for simplicity. It is meaningless to talk about a 499x engineer. As was explained to me, this engineer assigned two-week work units. If the work was not ready at the end of two weeks, he wrote it himself over the weekend. So, a fair bit of code was written that did not make it into the final product.
- sangnoir 5y agoLoC is a terrible metric - did they count the lines other engineers removed? I was half of a very productive duo on a greenfield project subsystem - a project I joined midway: my partner wrote a lot of code, I estimate ~70% of final lines in the code base were his. What the LoC count won't tell you is all the refactoring, deletion, tests and error handling code I had to add, because his code only worked for the happy path. Can you say he was being 2x more productive than I was? I say no, because he was breaking the nightly build at least once a week before I joined, blocking the rest of the team, this ended when I added pre-commit tests.
- ncmncm 5y agoWhen the numbers are large enough, the details don't matter much. Maybe he is really only a 250x engineer? A 100x engineer? It doesn't change the fact that without him no product would have been delivered.
- sangnoir 5y ago> It doesn't change the fact that without him no product would have been delivered. I agree. I'm only arguing that there are times when engineers who enable "10x/100x" engineering don't get the visibility they deserve, sometimes until after they quit. This hits close to home for me as I witnessed my partner being showered with praise for being "super productive" based on LoC alone, code which wasn't close to being production-ready. If you don't care about code quality, and want to be seen by management/people outside of your team as a 10x engineer with minimal effort: you can follow the same playbook.
- ncmncm 5y agoAgreed. It is rare that you can get objectively meaningful numbers. So, while it is convenient that half the code delivered was his, that is not the meaningful measure. When I was in school, the standard for engineer productivity was 10 lines of tested code per day, averaged. Maybe we do better today, with fewer footguns and faster compilers. But we expect more meaningful results from a line of code, too.
- 5y ago
- lostcolony 5y agoMaybe he was an amazing engineer 100s of times better than anyone else on the project...or maybe he was a bottleneck for everyone else. The latter I've seen. A lot. The former I have not.
- ncmncm 5y agoNot having seen it does not mean it does not exist. I have seen it more than twice. I hope to see it more times. I have also seen -10x engineers. Generally the best you can do is stay well clear.
- lostcolony 5y agoI'm not saying it doesn't exist. I did say 'maybe' after all. I am also implying the likelihood of it being that, rather than from a particular perspective an organizational detriment looks like a personal positive (somewhat akin to the 'heroic' team constantly responding to pages in production for their services; not like that lazy team that only works 8 hours a day and never gets paged), seems low. As mentioned, when one person seems to be doing all the work, yeah, it might be they're just amazing, or it might be that the project is badly managed, and so the work can't actually be distributed well. Both can also be true. I too have seen -10x engineers. Interestingly, others in the company also saw them as +10x. Someone who was the silo for a notoriously difficult part of the system was viewed by management as amazing (after all, he just went and got things done! They could focus their attention elsewhere!). When I then had to dig in, with actual production requirements, I found nothing really worked, nothing was designed well, nothing was documented, and the person was impossible to work with.
- bcrosby95 5y agoThis really isn't my experience with super productive engineers. Usually they're solving high level technical problems for the company that most employees wouldn't touch with a ten foot pole. It isn't the raw LOC they produce but their ability to translate complex technical problems into elegant solutions for everyone else to take advantage of.
- ncmncm 5y agoThe Death March is not a usual circumstance. In usual circumstances, different practices are indicated.