Casey Handmer calculated that it was cheaper to produce solar power in Boston for local use than it was to ship solar power from Arizona to Boston.[1] Solar p
by bryanlarsen 5y ago
Casey Handmer calculated that it was cheaper to produce solar power in Boston for local use than it was to ship solar power from Arizona to Boston.[1] Solar power is 3X as expensive to produce in Boston, but HVDC lines are even more expensive.
If it's uneconomical to ship from Arizona to Boston, then Chile to Asia seems even more problematic.
Although in this case the submarine HVDC line is competing against batteries since Chile and China are in different hemispheres. I hope with they have an accurate prediction for battery prices in their business plan, because the prices of batteries are dropping precipitously.
1: https://caseyhandmer.wordpress.com/2020/12/27/the-future-of-electricity-is-local/ https://caseyhandmer.wordpress.com/2020/12/27/the-future-of-...
- prostoalex 5y agoSource for cost is this document published in 2014 https://iea-etsap.org/E-TechDS/PDF/E12_el-t&d_KV_Apr2014_GSOK.pdf https://iea-etsap.org/E-TechDS/PDF/E12_el-t&d_KV_Apr2014_GSO... I have no idea whether those are still reasonable estimates, just wanted to point to a possibility of price improvement.
- bryanlarsen 5y agoIt appears that Casey's source is this $40/MWh project being built by 8 Minute Energy, so he has 2020 numbers. https://www.energy-storage.news/news/developer-8minute-says-more-than-24gwh-of-batteries-included-in-its-us-sola https://www.energy-storage.news/news/developer-8minute-says-...
- bryanlarsen 5y agoCasey is doing a green methane startup which depends on cheap solar for its viability, so I'm sure he has more accurate numbers, at least privately. The question is more of "when" than "if" his calculations are correct, since solar power prices are coming down a lot faster than HVDC line construction costs.
- jhawk28 5y agoI think the chile to asia is going to be cheaper than AZ to Boston because there is just ocean between chile and asia. It will be much more expensive over land and dealing with all the things in the way (roads, houses, railroads, tunnels, mountains...).
- orangepurple 5y agoOne option would be to go along the shoreline of the Gulf of Mexico and across Florida, then up along the coast.
- bryanlarsen 5y agoThe articles have the cost at $1000/km for overland and $1500/km for undersea respectively.
- TremendousJudge 5y agoYeah but as others pointed out, you can't produce solar power at night, no matter how costly the transmission is compared to local panels. Chile can produce solar power while it's nighttime in China.
- bryanlarsen 5y agoA big part of Casey's calculations are the cost of batteries. Batteries are expensive, but not as expensive as HVDC lines.