3 ms·
I only follow the California High Speed project from a distance and not in detail, but it was my understanding that the plan called for a route through a 2000 m
by inglor_cz 5y ago
I only follow the California High Speed project from a distance and not in detail, but it was my understanding that the plan called for a route through a 2000 m (6000 ft) high mountain range.
Most actual high speed lines in the world try to avoid such terrain as much as possible. The ones that actually need to cross comparable mountains (like the Alps) take decades to build (so called Basis Tunnels, in Switzerland and Austria) and the cost is staggering.
- LargoLasskhyfv 5y agoWhere there is the will, there is a way!