5 ms·
Lol your 150km loop captures Ottawa, Montreal and Kingston in Canada and Watertown/Plattsburgh NY. All of these are about as apples to oranges in relation to g
by dogman144 5y ago
Lol your 150km loop captures Ottawa, Montreal and Kingston in Canada and Watertown/Plattsburgh NY.
All of these are about as apples to oranges in relation to geographic ties to Massena as you can get.
Between Massena and those places is a whole lot of nothing for a couple hours.
That's like saying there is some meaningful geographic tie between Bethlehem, PA and NYC (133km), or that "Unity House, PA" is not remote because it's 143km away from NYC and its 8.4mil residents.
- jamincan 5y agoPerhaps Massena is geographically remote and isolated then, but it is certainly not when it comes to the electrical system, which is what is being discussed here. There is plenty of existing transmission capacity to export hydroelectric power from Massena even without Alcoa and Coinmint.