4 ms·
First, if you are doing heavy work, like fixing roads, you usually can't do it all day. Neither can most draft animals. Second, the mid day meal was the big o
by gbronner 5y ago
First, if you are doing heavy work, like fixing roads, you usually can't do it all day. Neither can most draft animals. Second, the mid day meal was the big one, and there was usually a nap as well. People had to walk to work, and it would be hard to get everyone back at the same time.
Third, the Lord's inventory of tools was limited, so better to have two shifts of reasonably rested people than one double shift of exhausted people.
- gadders 5y ago>> First, if you are doing heavy work, like fixing roads, you usually can't do it all day Not sure if this is true. I worked at a building site labourer and I've seen people digging trenches all day. I'm also pretty sure in the poorer parts of the 3rd world people are toiling for 8 hours a day in manual/ox-assisted agricultural work.