3 ms·
Reading about Katerra here and elsewhere brought me to a naïve question not easily answered by Google: How often are building blueprints re-used? E.g. I have
by ErikVandeWater 5y ago
Reading about Katerra here and elsewhere brought me to a naïve question not easily answered by Google:
How often are building blueprints re-used?
E.g. I have a company and we need to expand and want our own building. Do we really need to hire an architect to design something new? Surely someone has already designed a building in the last 5 years that would suit our purpose. Just buy those blueprints and make it again (with some slight adjustment for local codes, geography, etc.). Perhaps this is done frequently and simply not very noticeable?
(I understand the same blueprints may be reused for multiple buildings in one complex, and more often in the public sector).
- skybrian 5y agoThere are house plans you can buy, but I think they require a pretty flat site? It probably works better on a larger lot too.
- RileyJames 5y agoI wonder what licence or ownership the building owner has over the architectural drawings & blue prints. I imagine it wouldn’t be in an architects interest to have the plans sold multiple times. Tho on the flip side, it’s unlikely the plans would be used without changes, minor or major, which are likely best made by the original architectural firm. Which could become a source of additional business.
- andreareina 5y agoIt's common for the architect to stipulate in the contract that the plans are for the specific project (down to the location) and cannot be used for any other project.
- genocidicbunny 5y agoFrom what I've read/heard, reusing blueprints to a house is one of the more economical ways of building a new house. You start with a pre-made blueprint that has the necessary approvals, and do modifications to it as you please. Usually this should result in less bureaucracy to get the house built than designing from scratch.
- 7952 5y agoI think it is done frequently in commercial development, just not as a product that would be sold directly. The whole point of hiring an architect is so that you don't have to build that team within your own company. Even if you bought a set of blueprints you still need expertise to check, adjust, sign-off and take responsibility for that. And you have to get all that through corporate management and politics. All for something that is probably not your core business. You might as well hire an architect. And I doubt that the plans are even a large proportion of the price. There is communication, project management, scheduling, keeping aligned with all the other specialists, insurance, legal fees and just normal overheads. And when you want to build another building of a similar design the architect can reduce their fees to take advantage of reusing existing content. The architect becomes the go-to for a particular kind of development and can win bids based on experience. If you can do it in-house the designs become proprietary and won't be shared externally.
- jaclaz 5y agoMany many years ago (think about late '80's, early 90's) I was somehow involved in a division of the building company I was working forat the time (in Italy) dedicated to pre-fabricated buildings (not your typical solo villa, rather multi-apartments blocks). The head of the division was a very experienced and extremely smart technician, with some 20+ years expereience specific to pre-fabrication. The base ideas were three: 1. have a small number of pre-made, tested, industrialized/industrializable designs/blueprints, with a somewhat "modular" approach 2. build these faster and cheaper 3. profit At the end of the experience (several years/projects built) the results were that there was no way to re-use the same blueprints on different projects, due to a number of different reasons, local rules, size of the land lot, preferences (either technical or purely aesthetic of the client), whatever, each blueprint had to be modified/adapted/changed and at the end it took as much time and money as starting from scratch a new design. Then it came out (again, in practice) that building pre-fabricated (and then transported and assembled) at the same (high) quality level as built on spot costed roughly the same. It was only much faster, but I believe this mainly because you built panels/structures/etc. with highly specialized people, inside a perfectly tuned pre-fabrication area, protected from bad weather, with all the materials readily available, etc., and because of the much more accurate planning possible. No profit.
- CrimpCity 5y agoThis does not generally happen, at least full copy and paste. What usually gets used are the “details” which are the parts of the blue print modern terminology is Construction Drawings or CDs that show very zoomed in specifics which will be the same in many cases regardless of the global structure. There are major incentives and reasons why full copy and paste doesn’t happen more often some are cultural and some are technical. Culturally because construction projects tend to be very expensive architects sell the client by “building the client’s vision”. So the incentive is to keep making unique buildings every time. In this way architects earn their keep and along the way if they can make their current client happy it may turn into a bigger future project. Technically speaking a new location introduces new variables which the old building design may not meet. For example there may be new risks of earthquakes, hurricanes, tornados, blizzards, high heat/moisture, poor soils (this is the big one). Additionally a new location may require new construction materials or ways of building/methods. Any one of these could lead to large design changes. When the risks might not change our understanding of them might so we may need a new design due to new building code updates. Also building codes and requirements are controlled at the local level so they may vary by legal jurisdiction so even though all else is equal the original design does not meet the code governing the new location. Interestingly there was an open source house project a couple of years ago with the ambition of over designing it so that you could build it in any part of the US. I personally love the idea however I am very skeptical due to the way construction liability works. So say there was a collapse who does the owner sue? Is it the designers all 100 of the people who contributed to the project? What if some aren’t engineers but hobbyists? What if they don’t have engineering insurance? Do they sue the contractor who built it? As you can see it gets quite messy. Construction being an old and mature industry has a lot of regulations about legal responsibility which IMO don’t play well with the modern day tech ethos of “just build”.