3 ms·
I forgot to mention that Hydro Ottawa does the build for the future thing. Hydro Ottawa's design standards are to design for a minimum of 3 communications stra
by bcrl 5y ago
I forgot to mention that Hydro Ottawa does the build for the future thing. Hydro Ottawa's design standards are to design for a minimum of 3 communications strands on all new poles. This results in significantly less make-ready on Hydro Ottawa poles. Hydro One in contrast has no such mandatory design standards, so whatever the ADET feels like on the day they're doing the design work is what gets installed.