3 ms·
Speaking as a former fab manufacturing engineer (back when AMD had fabs): 5 nodes in 4 years, is extremely optimistic. As in, I don't think it's ever been done
by rossdavidh 5y ago
Speaking as a former fab manufacturing engineer (back when AMD had fabs): 5 nodes in 4 years, is extremely optimistic. As in, I don't think it's ever been done in the history of the industry.
On the other hand, several of those nodes have been running in production elsewhere for a while now, so it's not quite as crazy as it sounds. But, highly ambitious.
- bloodyplonker22 5y agoIt really comes down to the people, and well, Intel doesn't have the best people today. They had a massive brain drain and those people are not coming back anytime soon considering how well their stock is doing at competing companies.