3 ms·
Sorry I should have been precise and said dispatch able one per clock cycle, not latency one clock cycle. Amortized over pipelined operations with no dependenc
by dnautics 5y ago
Sorry I should have been precise and said dispatch able one per clock cycle, not latency one clock cycle. Amortized over pipelined operations with no dependencies, the net cost of such an operation is one clock cycle.
Anyways I checked it, it's DPPS, and it is a 25 clock cycle latency operation, with a throughput that yields an amortized 6 clock cycle cost.