3 ms·
France’s oldest operating reactors are in the 900 MWe range, so more like 3. Their newer fleet is 1300 and 1450 (now 1500) MWe, plus the 1600 MWe EPR under cons
by _n_b_ 5y ago
France’s oldest operating reactors are in the 900 MWe range, so more like 3. Their newer fleet is 1300 and 1450 (now 1500) MWe, plus the 1600 MWe EPR under construction at Flamanville.
The 300 MWe NuWard really only makes sense as an export product, even if they build a couple in France. Framatome and EDF are working on an EPR-2 that is meant to be more efficient and inexpensive to build, and I hope that means it will be a bit scaled down from the EPR, which is frankly too large for many electric grids, and takes far too long to construct.