6 ms·
Actually, if you don't run test your generator regularly it's very unlikely to work when you do need it. Here's a doc from cummins, a generator mfgr: http://ww
by emaste 15y ago
Actually, if you don't run test your generator regularly it's very unlikely to work when you do need it.
Here's a doc from cummins, a generator mfgr:
http://www.cumminspower.com/www/literature/technicalpapers/PT-7004-Maintenance-en.pdf http://www.cumminspower.com/www/literature/technicalpapers/P...
It claims that the generator should be run for 30 minutes every month, loaded to at least one third of the rated capacity. So testing every month is exactly what you want to do.
- rdl 15y agoRight, but the thing you don't test is the transfer switch/sync gear. Powering up the generator and dumping the output as heat weekly is pretty standard practice.
- ams6110 15y agoAlso don't forget to check the fuel tanks. With the rise in fuel prices the past couple of years, theft of diesel from backup generators has become more common.