2 ms·
I think you are trying to twist what I said, but I will grant it could be read that way if you really want it. From one inspection to another, things wear down.
by dylan604 5y ago
I think you are trying to twist what I said, but I will grant it could be read that way if you really want it. From one inspection to another, things wear down. It could be a note in one report, a concern in one following, and even a must repair in a future report. Again, no hoodwinking necessary. Corp says that they are not going to do anything at a recommended status, and only consider things indicated as required. For example, the recent Texas debacle where the plants were recommended to weather proof their facilities but elected not to do it for something they felt the costs were not justified.
- i_am_proteus 5y agoPublic confidence in PG&E is eroded, maybe rightly so, because the California (state) regulator let them get away with deferred safety-critical maintenance. Whether that's on California or the utility or both, I don't know, but PG&E just can't pull those kinds of shenanigans with the NRC. If there's a safety-critical problem with the plant, it gets fixed.