While not familar with how things are in the UK, I understand DNO, which is the layer of the distribution network. Which means the part from power-plant->substa
by LargoLasskhyfv 5y ago
While not familar with how things are in the UK, I understand DNO, which is the layer of the distribution network. Which means the part from power-plant->substation->high voltage line to at least one other substation near a city, or so. That does not include middle voltage into the city, or further downstepping until it is fit for your wall socket or similar.
If it claims to, it is a political fiction like so many other. In reality transmission losses from the one virtual plant powering the grid to your wall socket range from about
50% to 60% depending on the grid and many other factors.
Anything else is wishful thinking.
- mrjin 5y agoSeems you have more detailed info. I just checked full-load efficiencies of transformers and it turned out to vary from 95% to 98.5% and the comprehensive efficiency can actually drop below 90%. If we factor in the loss on wires, I guess my estimate of loss per transformer layer 10% should be pretty close to actual. So I'm not surprised to see a transmission loss of 50% to 60%.