3 ms·
As I understand it, the bigger problem around fusion that we're still working towards fixing is being able to maintain an actively fusioning plasma. All of thes
by ufmace 5y ago
As I understand it, the bigger problem around fusion that we're still working towards fixing is being able to maintain an actively fusioning plasma. All of these Q measurements are around very short runs, sub-second I think. ITER seems to have a goal of 400-second runs, which sounds more like it. Once we have enough understanding of plasma physics and confining magnet behavior, it will hopefully be more straightforward to optimize the energy going into the plasma, and the energy going into the magnets and cooling system, etc to hopefully achieve a QTotal > 1. And maybe have enough heat being generated that it'll be necessary and reasonable to attach a boiler to it, hook it up to a steam turbine and generator, and make some electricity.
- zardo 5y agoW7-X was supposed to demonstrate a 30-minute run in 2021, but that's been pushed back a year.
- willis936 5y agoMostly because of the you-know-what. W7-X is not a tokamak nor a nuclear machine. It's designed to run all day and no one on the planet doubts it. The upgrade to get it to 30 minute pulses is primarily to the heat dissipation subsystem. The ECRH subsystem of W7-X is eyewateringly beautiful.