a calendar "order of magnitude". I can't think of a better term.
by janto 5y ago
a calendar "order of magnitude". I can't think of a better term.
- powersnail 5y agoPerhaps “up a unit of measurement”?
- janto 5y agosounds about right
- bluenose69 5y agoThis is what I was taught: double the estimate, and increase to the next unit. It was mostly as a joke, though. The wise scheme, as has been pointed out, is to adjust predictions during a project. If the task that was initially planned to take a day is routinely taking 2 days (or 2 hours), adjust future plans accordingly. Higher-level managers are sometimes unhappy with this scheme, while middle-level ones value the accuracy of such predictor-corrector schemes. This gets us into a related topic of the depth of management structures, and I think the military scheme (of each person directing a roughly fixed number of persons, so the number of levels is proportional to the log of workforce size) might be worth considering.
- mdp2021 5y agoI would say it is a "superset timeframe".