5 ms·
There is (if it has not been scuppered by brexit) Icelink, a project to connect Iceland to the UK. The rationale, as usual, is mismatched supply and demand, whe
by mannykannot 5y ago
There is (if it has not been scuppered by brexit) Icelink, a project to connect Iceland to the UK. The rationale, as usual, is mismatched supply and demand, where the supply is green geothermal power.
https://askjaenergy.com/2018/04/17/icelink-in-operation-by-2025/ https://askjaenergy.com/2018/04/17/icelink-in-operation-by-2...
The idea of connecting solar farms in the Sahara to Europe under the Mediterranean is also perennially in the air, with the same rationale as Icelink.