4 ms·
Something that helps but is little-practiced is just making structures hollow. For instance instead of pouring 300 cubic meters of concrete for one of SFMTA's a
by jeffbee 5y ago
Something that helps but is little-practiced is just making structures hollow. For instance instead of pouring 300 cubic meters of concrete for one of SFMTA's absurd high-floor boarding platforms[1], some agencies are building similar structures that begin by placing hollow, prefabricated, fiberglass boxes and pouring concrete around them, reducing the total concrete in the project by an order of magnitude.
A little bit of engineering goes a long way.
1: https://www.google.com/maps/@37.7801361,-122.3895982,39a,49.7y,202.06h,64.97t/data=!3m1!1e3 https://www.google.com/maps/@37.7801361,-122.3895982,39a,49....
- lazide 5y agoThe other very common approach (that has been used for millennia) is use gravel or similar fill. Making the whole thing out of monolithic concrete would be really absurd - both from cost and from shrink cracking and similar issues.
- jeffbee 5y agoCracking is just a profit center for Tutor-Perini. If the structure lasts for more than a few years how are they going to get paid?