3 ms·
A big part of the cost increase is also linked to political and social fears: after Chernobyl contracts dropped through the floor so there’s been a huge loss of
by masklinn 5y ago
A big part of the cost increase is also linked to political and social fears: after Chernobyl contracts dropped through the floor so there’s been a huge loss of knowledge in both building and designing new plants.
Plus designers tried to design even safer plants, meaning costs increase, meaning you want to increase power density, leading to further complexity and thus cost increases.
The would would be in a much better position if we’d kept building (and improving) Gen IIs as we tried to resolve Gen III’s teething issues.