3 ms·
Oh no! A TODO is almost never written with the level of detail I'd want in a JIRA ticket. I think usually, if I'm leaving a few TODOs in a checkin, it's to high
by cdcarter 5y ago
Oh no! A TODO is almost never written with the level of detail I'd want in a JIRA ticket. I think usually, if I'm leaving a few TODOs in a checkin, it's to highlight several locations where a single change needs to be made. Automatically creating new tickets for each call site sounds like hell.