3 ms·
I think you guys need gas as peak power long time but coal is now in borrowed time. At least Germany is started moving towards power to hydrogen but it takes li
by antupis 5y ago
I think you guys need gas as peak power long time but coal is now in borrowed time. At least Germany is started moving towards power to hydrogen but it takes like 10+ years to build truly big industrial scale production for P2H. Same for grid scale batteries eg which are moving right direction but not there yet.
- joe-collins 5y agoEven gas might dwindle faster than you'd think. https://arstechnica.com/science/2021/01/new-study-a-zero-emissions-us-is-now-pretty-cheap/ https://arstechnica.com/science/2021/01/new-study-a-zero-emi...
- kumarvvr 5y agoIs producing hydrogen a sustainable process, as in, the cycle does not spit out waste products that are un usable? Of course, this is assuming that the power to produce Hydrogen is from renewable sources.