4 ms·
We run about 40-50 CNC. Lots of our engineering time goes in to planning, on how to step by step machine a component so that it can reach mentioned tolerances.
by iamgopal 5y ago
We run about 40-50 CNC. Lots of our engineering time goes in to planning, on how to step by step machine a component so that it can reach mentioned tolerances. Sometimes required tolerance are at or below the machine accuracy. Are you going to solve this also ?
- contingencies 5y agoI am looking at the low hanging fruit, 80/20 right now.