2 ms·
Yes, that's what I usually end up doing: having a DB dump that I can load back in at the beginning of the test, then drop it at the end. I can see how a purely
by IgorPartola 15y ago
Yes, that's what I usually end up doing: having a DB dump that I can load back in at the beginning of the test, then drop it at the end. I can see how a purely stored procedure test harness would have a hard time with this. However, if you just wrap your unit tests in a shell script, you should be able to do this.