When I did consulting we used the PM Triangle and STR [1] where Scope = Time x Resources and could add people to the project when scope and time were sticky (
by 1001101 5y ago
When I did consulting we used the PM Triangle and STR [1] where
Scope = Time x Resources
and could add people to the project when scope and time were sticky (say a project had to be ready for a trade show, or stuff had to be at distribution by August to be in stores by Christmas).