2 ms·
Quite possibly. I realised after I posted that I wasn't quite sure what the axis of your plot were (I'm still not).
by nicoburns 5y ago
Quite possibly. I realised after I posted that I wasn't quite sure what the axis of your plot were (I'm still not).
- sokoloff 5y agoX axis is value delivered per engineer, increasing with X. Y axis is a histogram of “number of engineers producing that value”, increasing with Y. This, but for value instead of IQ: https://en.m.wikipedia.org/wiki/File:IQ_curve.svg https://en.m.wikipedia.org/wiki/File:IQ_curve.svg