2 ms·
For the full network: 42000 sats 20gbps each ~1k users 2gbps @ 100:1 oversub 1gbps @ 50:1 oversub And that’s assuming next generations wil
by ricardobeat 5y ago
For the full network:
42000 sats
20gbps each
~1k users
2gbps @ 100:1 oversub
1gbps @ 50:1 oversub
And that’s assuming next generations will not improve downlink speeds. It does assume satellites would be fully utilized which is wrong unless we populate the oceans, but that’s the theoretical max.
- shaklee3 5y agoThat's the entire point. They're mostly over the ocean/areas without high-paying customers 70-90% of the time. Because of that, it would be more like (in the best case): 42k sats@20G * 0.2 * 5 million subs target = 33Mbps/sub. However, that's not even close to realistic either because the high-paying subs are in the US and parts of Europe only, and you can't keep piling 42k satellites in the same plane. So in reality, that will be cut significantly from that.