3 ms·
From Release Note 0.8 Roadmap [1], >The major theme of the 0.9.0 release cycle will be stabilizing the language, creating a first draft of the language specifi
by ksec 5y ago
From Release Note 0.8 Roadmap [1],
>The major theme of the 0.9.0 release cycle will be stabilizing the language, creating a first draft of the language specification, and self-hosting the compiler.
So I am guessing we could see 1.0 release within 12 months time? Or will there be 0.10 or 0.11 after that?
I am just eager to hear people's comments and opinions for using it in production within their context and edge cases.
And as a sort of side note, I quite like the momentum and the way Andrew has been handling Zig's PR. I just hope and pray HN keep that tradition, dont over hype it.
[1] https://ziglang.org/download/0.8.0/release-notes.html#Roadmap https://ziglang.org/download/0.8.0/release-notes.html#Roadma...
- kristoff_it 5y ago> So I am guessing we could see 1.0 release within 12 months time? Or will there be 0.10 or 0.11 after that? 1.0 is going to take a lot longer than that.
- geodel 5y agoI guess at least 2 major things after 0.9 would be package manager, library standardization and cleanup which would take many releases and perhaps need to be done before 1.0