It’s 20,000 tons in stage 1 which is still huge. https://investingnews.com/company-profiles/controlled-thermal-resources-lithium-and-renewable-energy/ https://
by twobitshifter 5y ago
It’s 20,000 tons in stage 1 which is still huge.
https://investingnews.com/company-profiles/controlled-thermal-resources-lithium-and-renewable-energy/ https://investingnews.com/company-profiles/controlled-therma...
Hell’s Kitchen is expected to have a minimum 30 year life. Stage 1 of production is slated to begin in 2023, with a 20,000 tonnes per annum lithium hydroxide facility along with the generation of 49.9 megawatts of renewable energy from the integrated geothermal power plant.
- nickik 5y agoAnd there is about 99% change they will not reach that. The amount of Lithium projects that have not reached there targets in the last decade is amazing. Even the expansion plans of the 'big' lithium producers have been massively delayed. There has never been a single geothermal lithium project that was actually successful.