3 ms·
Full buildout, cutting holes and running ductwork, etc. Thats the quote for materials and labor, yes. If I did it a year ago it would be 20k less :/
by SEJeff 5y ago
Full buildout, cutting holes and running ductwork, etc. Thats the quote for materials and labor, yes.
If I did it a year ago it would be 20k less :/
- Cipater 5y agoWould you mind detailing why the cost difference would be so large from last year to this? An almost 100% increase is quite substantial, no?
- SEJeff 5y agoBuilding materials all went through the roof. They’ve not came back down and hvac hardware followed suit. https://www.constructiondive.com/news/skyrocketing-steel-lumber-costs-threaten-to-slow-construction-jobs/594969/ https://www.constructiondive.com/news/skyrocketing-steel-lum... https://www.benningtonbanner.com/local-news/cost-of-building-materials-through-the-roof/article_39e14984-ce1a-11eb-8254-5f897153cbd6.html https://www.benningtonbanner.com/local-news/cost-of-building...
- Cipater 5y agoThank you.