4 ms·
On the same site there is a file "email-related-2018-structural-field-survey-report.pdf" which contains/embeds the same report in searchable format, and on page
by cagey 5y ago
On the same site there is a file "email-related-2018-structural-field-survey-report.pdf" which contains/embeds the same report in searchable format, and on page 18 includes a table "ENGINEER'S ESTIMATE OF THE PROBABLE CONSTRUCTION COST" whose bottom line is
TOTAL SUMMARY OF REMEDIATION PROBABLE CONSTRUCTION COST
$9,128,433.60
- nielsbot 5y agoThat's a very specific number for an estimate :)