3 ms·
I want to know if an analytical monotone is typical for these reports. Would a report like this be expected to emphasize urgency or would the reader be assumed
by MattGaiser 5y ago
I want to know if an analytical monotone is typical for these reports. Would a report like this be expected to emphasize urgency or would the reader be assumed to know that "major structural damage" means urgent?
If I were writing a report on a piece of software for my boss and I found unsanitized inputs to an SQL database, I wouldn't highlight that any more than anything else I found as he would know that was severe.
- SAI_Peregrinus 5y agoQuite typical from the ones I've seen (I'm not a StructE). This is actually quite alarming language for an engineering report, about one step below "imminent collapse" and "immediate evacuation".