3 ms·
OMG why is this not searchable text?! (Instead of pictures of the report's pages)
by nielsbot 5y ago
OMG why is this not searchable text?! (Instead of pictures of the report's pages)
- cagey 5y agoOn the same site there is a file "email-related-2018-structural-field-survey-report.pdf" which contains/embeds the same report in searchable format, and on page 18 includes a table "ENGINEER'S ESTIMATE OF THE PROBABLE CONSTRUCTION COST" whose bottom line is TOTAL SUMMARY OF REMEDIATION PROBABLE CONSTRUCTION COST $9,128,433.60
- nielsbot 5y agoThat's a very specific number for an estimate :)