2 ms·
You think that building 4 systems in 4 locations is likely to have a similar cost to one system at one location? For small systems, the fixed costs are a signif
by Godel_unicode 5y ago
You think that building 4 systems in 4 locations is likely to have a similar cost to one system at one location? For small systems, the fixed costs are a significant portion of the overall system cost.
This is doubly true for physical or self-hosted systems.