You could also add Sagrada Familia in Barcelona to the list, construction began in 1882 and might be done by 2032. https://en.m.wikipedia.org/wiki/Sagrada_Fam%
by sharken 5y ago
You could also add Sagrada Familia in Barcelona to the list, construction began in 1882 and might be done by 2032.
https://en.m.wikipedia.org/wiki/Sagrada_Fam%C3%ADlia https://en.m.wikipedia.org/wiki/Sagrada_Fam%C3%ADlia
- mkl 5y agoThat wasn't the original plan though.
- robin_reala 5y agoIf we’re talking cathedral delays, Köln Cathedral was started in 1248 and finished in 1880.
- sharken 5y agoQuite a turn of events that made it possible to resume that building after the original plans were found, here is the summary i found: > In the 1790s, when the French Revolutionary Army drew close to Cologne, the Cathedral treasures were removed for safekeeping. These included the plans and drawings for the west front, which were transported with other items to Amorbach and eventually lost and forgotten. In Amorbach, the large “F-Plan” was used by a family for some time to dry beans, and later wrapped around their son’s new suitcase to protect it as he traveled to the university in Darmstadt. It was in Darmstadt, in the attic of the inn where the son arrived that the Plan was rediscovered and recognised by G. Moller as the missing drawing of the west front. Source https://pdxscholar.library.pdx.edu/younghistorians/2012/oralpres/5/ https://pdxscholar.library.pdx.edu/younghistorians/2012/oral...
- dhosek 5y agoAlthough medieval cathedral construction plans did often have timelines of roughly a century. The reconstruction of Notre Dame in Paris is expected to be 20–40 years which puts it awfully close to the 2070 completion date as well.