3 ms·
Here in Norway the main limitation seems to be cost, not for the chargers but for the connection to the grid. Installation might require increasing the local t
by magicalhippo 5y ago
Here in Norway the main limitation seems to be cost, not for the chargers but for the connection to the grid.
Installation might require increasing the local transformer station, which whoever wants the capacity has to share the cost for. This can be very expensive, usually hundreds of thousands USD from what I understand.
Also the running costs can be significant, as there's a separate grid charge based on the peak kW used per month. This can add up to a lot if multiple chargers are used simultaneously.