3 ms·
And now the design of the road with the bridge and the roundabout connecting the road with N707 has a costly consequence. They want to introduce a tunnel to pas
by bouke 5y ago
And now the design of the road with the bridge and the roundabout connecting the road with N707 has a costly consequence. They want to introduce a tunnel to pass the N707, but the altitude of the road due to the bridge leaves little room to make that possible.