2 ms·
I once hired an outfit to install a patio in the yard. They gave me a bid based on per-square-foot cost, which I accepted. They leveled it and staked out the e
by WalterBright 6y ago
I once hired an outfit to install a patio in the yard. They gave me a bid based on per-square-foot cost, which I accepted.
They leveled it and staked out the elliptical shape. I'm a very poor judge of size, but something made me suspicious and I brought out the measuring tape. Did a little calculation based on the formula for the area of an ellipse. It was 30% smaller than the contract bid.
There was a couple pallets of bricks for it in the street. I measured a brick and did a little multiplication, and discovered that the quantity of bricks matched the measured size, not the the contract bid.
I called them up, and they denied it, then said they'd made a math mistake.
Baloney. They were trying to cheat me. I hypothesized that they'd discovered that few people noticed when they oversized the square footage in the contract, and they kept going further and further with that, and expected to get away with being a full 30% off.
Knowing a bit of high school geometry paid a big dividend that time for me.