4 ms·
Although at these scales, a CCP at 400MW output is "only" ~$300M, so building that small power station might not be that big a deal compared with the cost of tu
by neltnerb 5y ago
Although at these scales, a CCP at 400MW output is "only" ~$300M, so building that small power station might not be that big a deal compared with the cost of turning off?
- baybal2 5y agoI believe things are moving progressively in this direction.