3 ms·
Cost is the rate. Acceptability and distortion are the same thing (although the curves are different).
by astrange 6y ago
Cost is the rate. Acceptability and distortion are the same thing (although the curves are different).
- pocak 6y agoIn the article, cost is cpu time, and benefit is file size reduction multiplied by number of times watched.