3 ms·
The idea that $160 billion will build that, much less by 2035, is comical. Maryland’s purple line will end up costing half a billion per mile to build non-grad
by rayiner 6y ago
The idea that $160 billion will build that, much less by 2035, is comical. Maryland’s purple line will end up costing half a billion per mile to build non-grade separated light rail trolly through suburbs.
- masklinn 6y agoThe cost per mile is completely different between light rail and regular / high-speed rail, tho. The french LGV Est cost about 10k€ / mile (4bn for 252 miles), and it was not considered cheap. And that's including 800 millions worth of rolling stock too. If we exclude the rolling stock from Est's cost and assume those 160bn will be purely infrastructure, it should get you about 12500 miles of track (stations included).