4 ms·
I usually don't pin, I'd rather deal with upstream BC breaks as they are published instead of accumulating tech debt. I call this "continuously integrating upst
by 1337shadow 6y ago
I usually don't pin, I'd rather deal with upstream BC breaks as they are published instead of accumulating tech debt. I call this "continuously integrating upstream code", because Continuous Integration is a practice, not a tool.