3 ms·
Fair enough about the eastern part, but as you say we're lacking something comparable to the western half as a starting point. I'd been sort of implicitly avera
by iggldiggl 6y ago
Fair enough about the eastern part, but as you say we're lacking something comparable to the western half as a starting point. I'd been sort of implicitly averaging the two halves together for the US.
Regarding electrification, yes, it's not rocket science, and the cost of raising bridges and tunnel clearances will usually dominate, but because electrification on the main lines covers basically every metre, I'd think that the costs would still add up significantly.
- sjsamson 6y agoThere are overhead electric rail lines supporting double stack freight in the NEC USA, China, India, and possibly elsewhere. There are YouTube videos and images on web. AAR Plate H (20’ 2”) is the North American rail loading gauge for double stack containers, so 21’-23’ for the electrical lines is enough clearance. Nothing unusual here, straight forward for new lines, but as you noted potentially a lot work/cost on existing lines to create enough clearance due to raising overpasses/structures and/or undercutting them and tunnels.
- Animats 6y agoThat's tight. Here's a document from Network Rail on the practical problems of trying to increase the loading gauge in the UK so containers can fit on electrified lines.[1] That's just to make room for single height containers. In the UK, the catenary clearance is sometimes reduced to get under historic bridges, but that requires slowing trains way down. Sometimes the rail bed is lowered, but that creates drainage problems. Raising historic masonry bridges is even harder. This document has good pictures of all the problems. [1] https://www.bathnes.gov.uk/sites/default/files/sitedocuments/Planning-and-Building-Control/Planning/nr_a_guide_to_overhead_electrification.pdf https://www.bathnes.gov.uk/sites/default/files/sitedocuments...