it's one thing to interconnect a few GW here and there, but to power the Texas grid you need 80GW or so. That is a humongous amount of power. You would need at
by flavius29663 6y ago
it's one thing to interconnect a few GW here and there, but to power the Texas grid you need 80GW or so. That is a humongous amount of power. You would need at least 10-20 HVDC projects that span thousands of miles each.
BTW, Texas is already connected to the other grids, but not synchronized, e.g. https://www.tdworld.com/overhead-transmission/article/20964502/abb-replaces-hvdc-link-in-the-united-states https://www.tdworld.com/overhead-transmission/article/209645...
As we all know, these kind of connections were not enough during the big freeze.
But say you make that investment. That is still not a guarantee that you won't have a continent wide lull without sun or wind. You just can't risk it. It's cheaper and more effective to just install some gas turbines for backup. If you fire them up 2 times a year it won't matter for the CO2 budget.
- yazaddaruvala 6y agoYeah I think we are on the same page. It’s likely just a difference between thinking 10-30 years out, and thinking 100-300 years out.
- flavius29663 6y agoI don't see how more years make it more likely to have more interconnection. The power requirements will balloon, it might be still cheaper to have some local generators instead of investing in long range transmission