3 ms·
> industrial consumers in Europe have the same stipulation in their power contracts: in case of emergency, the power company (network operator) may choose to s
by brmgb 6y ago
> industrial consumers in Europe have the same stipulation in their power contracts: in case of emergency, the power company (network operator) may choose to suspend power delivery to protect the grid.
You can't really compare.
Industries can chose in their contract to be part of the load shedding system. It's done with their agreement and the system is purely based on the grid frequency. The disconnection is done on site in an orderly fashion. In a way, it's probably more correct to view it as industries electing to temporary disconnect rather than the provider stopping supplying them.
> I don't recall any grid-wide emergency events.
The European electrical grid is extremely resilient. It was accidently split in two a couple months ago and that was barely noticeable for the customers of either half.