2 ms·
It's really a pipeline problem. You start the core design 2 or 3 years out, with the design rules you expect to be able to fab on. It's relatively easy to fab a
by toast0 6y ago
It's really a pipeline problem. You start the core design 2 or 3 years out, with the design rules you expect to be able to fab on. It's relatively easy to fab a 14nm design at 10nm if the 10nm fab shows up early, but it's hard and messy to take a 10nm design and fab it at 14nm if the 10nm isn't working so well.
But when you're "close" to getting your 10nm fab working, it's hard to start a new design for 14nm. If their 7nm had shown up ready to go, that would have saved them, but it looks troubled too. Maybe they'll be able to work out the kinks faster on 7nm.
Maybe they'll design something out of character for Intel that works for the realities of their 10nm process; from what I can tell, their 10nm process is mobile only because it doesn't clock well, they could turn that into a less negative by doing a design they normally couldn't do because of the need for high clockspeeds. It may look copycat of M1, but something that's a lot wider might be viable with a 3Ghz clock target, but isn't viable for 5Ghz that Intel needs to hit on desktop chips.